dc.description.abstractThis paper introduces a continuous commissioning of the VAV system in a real building in China. On the base of nearly one year's testing data, the energy conservation level of the project is analyzed, and significance of further commissioning is emphasized. A systematic evaluation method for existing building's commissioning is developed. Moreover, this paper provides important experience and a feasible evaluation system for development of commissioning in China.en
dc.format.extent407811 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu)
dc.publisherTexas A&M University (http://www.tamu.edu)
dc.subjectcommissioningen
dc.subjectVAVen
dc.subjectRRPSen
dc.subjectTDCAen
dc.subjectESRen
dc.titleA Case Study of Continuous Commissioning of the VAV System in Chinaen