Search
Now showing items 1-3 of 3
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Texas Senate Bill 5 Legislation for Reducing Pollution in Non-Attainment and Affected Areas: An Overview of Legislative Responsibilities, Code Compliance Issues and Accomplishments
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The 77th Texas Legislature, in 2001,
established Senate Bill 5, SB-5, which addressed
NOx emission reductions by establishing
programs to reduce vehicle emissions and
reductions due to energy efficiency and the use
of ...
Using Simulation Models for District Chilled Water Distribution Systems Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The capital investment for the distribution system is often the most expensive portion of a district heating
and cooling system, which usually constitutes 50 to 70% of the total cost. Because of high initial cost, it is
very ...