Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
Results of CC Follow-Up in the G. Rollie White Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
An investigation into the increase of energy
consumption of G. Rollie White Coliseum was part
of the persistence project[1], which investigates the
savings in energy consumption of ten buildings that
were commissioned by ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Correcting Thermal Distribution Problems for a Large University Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Texas A&M University main campus in
College Station consists of 114 buildings served by
two central plants. The two main campus loops are
more than 50 years old with a total piping length for