Search
Now showing items 1-3 of 3
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Remote Fault Detection of Building HVAC System Using a Global Optimization Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The energy efficiency of HVAC systems in
buildings often degrades with the passage of
time. Significant engineering time is normally
required to determine the cause(s) of the
degradation. This paper reports a preliminary ...
Using Simulation Models for District Chilled Water Distribution Systems Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The capital investment for the distribution system is often the most expensive portion of a district heating
and cooling system, which usually constitutes 50 to 70% of the total cost. Because of high initial cost, it is
very ...