Now showing items 1-3 of 3

    • Wang, S.; Sun, Y.; Huang, G.; Zhu, N. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
      This paper presents a control scheme which utilizes the enhanced instantaneous cooling load measurements to improve the reliability of chiller sequencing control. The enhanced measurement is obtained by merging two different ...
    • Plesser, S. Pinkernell, C.; Fisch, N.; Rumpe, B.; Kurpick, T. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2010)
      Energy efficient buildings require high quality standards for all their technical equipment to enable their efficient and successful operation and management. Building simulations enable engineers to design integrated HVAC ...
    • Khan, S.; Bible, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2012)
      The overall efficiency of the Continuous Commissioning (CC) process relies on the interactions of the commissioning team, the building owner, and the building operators. At times the process may be hindered by the traditional ...