Browsing ICEBO - International Conference for Enhanced Building Operations by Author "Deng, S."
Now showing items 21-25 of 25
-
Chen, H.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bensouda, N. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
-
Liu, C.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)The Langford “A” building houses the College of Architecture on TAMU campus. There are ten singleduct variable air volume (VAV) air-handling units (AHUs) without reheat serving the building. The local pneumatic thermostats ...
-
Liu, C.; Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H., Jr. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)Cushing Library located on TAMU campus is a special building, which needs precise temperature and relative humidity control, because it stores a number of rare collections and memorial books. There are five air-handling ...
-
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC Deng, S.; Claridge, D. E.; Turner, W. D.; Bruner, H. L.; Williams, L.; Riley, J. G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
-
Deng, S.; Claridge, D. E.; Turner, W. D.; Riley, J. G.; Williams, L.; Bruner, H. L. (Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning® (CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...