Integration of Continuous Commissioning as a Measure in LoanSTAR and Energy Services Contracts
(Energy Systems Laboratory, 2009-11)
Continuous Commissioning (CC) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...
Continuous Commissioning® of the Austin City Hall
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
This paper presents a case study of a Continuous Commissioning (CC) project performed at the Austin City Hall. Various CC measures were implemented and significant energy savings were achieved. The paper illustrates a ...
How Much Can a Campus Save on Utility Bills by Turning a 5-Workday Week Into a 4Workday Week
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The recent budget cuts campaign mandated
by the governor's office had all state agencies in
Texas looking for ways to reduce revenue
spending. One of the cost savings opportunities
perceived by many university officials ...
Chiller Start/Stop Optimization for a Campus-wide Chilled Water System with a Thermal Storage Tank Under a Four-Period Electricity Rate Schedule
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The existence of a 1.4-million-gallon
chilled water thermal storage tank greatly
increases the operational flexibility of a campuswide
chilled water system under a four-part
electricity rate structure. While significant
...
Exploring Maximum Humidity Control and Energy Conservation Opportunities with Single Duct Single Zone Air-Handling Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Humidity control for single-duct single-zone (SDSZ) constant volume air handling units is known to be a challenge. The operation of these systems is governed by space temperature only. Under mild weather conditions, discharge ...
Airside Economizer- Comparing Different Control Strategies and Common Misconceptions
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...
Integration of Continuous Commissioning as a Measure in LoanSTAR and Energy Services Contracts
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
Continuous Commissioning® (CC®) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions ...
Airside Economizer – Comparing Different Control Strategies and Common Misconceptions
(Energy Systems Laboratory, 2008-12)
Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...