Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
Simulation and Optimization on Power Plant Operation Using Sega's EOP Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The operation of a cogeneration power plant is
complicated. The Energy Optimization Program
(EOP, software made by SEGA, Inc.) was designed
to simulate and optimize the operation of TAMU
power plant. All major plant ...
The Brazos Valley Energy Conservation Coalition, Part of the Rebuild America Program in Texas: Program Update
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The Rebuild America program is network of
community-based partnerships that rebuilds
communities by promoting the efficient use of
energy. Rebuild America is coordinated at the
national level by sponsorship through the ...
Commissioning of A Large Office Building in Texas - A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
This case study involves commissioning of a
large office building in the hot and humid climate of
south Texas. The commissioning involved the
installation of a VFD (Variable Frequency Drive) on
a chilled water pump, improved ...
Investigation of PVC Pipe Failure at Terrell State Hospital – Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
At the request of Terrell State Hospital and MHMR, the Energy Systems Laboratory at Texas A&M University investigated the failure of the PVC pipes serving the chilled water loop at Terrell State Hospital. There were two ...
Integrated Commissioning for a Large Medical Facility
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The energy costs of heating, ventilating and
air conditioning usually represents a large
portion of the utility bills for a medical facility.
One large, modem medical center located in the
hot and humid region of southern ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Continuous Commissioning of a Central Chilled Water & Hot Water System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A central chilled water / hot water system
provides cooling / heating energy from central utility
plants to multiple customers (buildings) through
campus distribution loops. To effectively transport
the chilled water and ...
Development of a Procedure for the Predictive Control Strategy of a Chilled Water Storage System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
Thermal energy storage systems store the
thermal energy produced by the chiller plant in
periods of off-peak electrical demand or when
cheaper electricity is available. The stored thermal
energy is then withdrawn from the ...
Optimization Measures for Sporting and Special Event Facilities: Design and Operation
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
Reducing unnecessary building energy costs
is becoming more of a priority. Rising fuel
prices and a global emphasis on energy
efficiency are key contributing factors. This
push towards energy efficiency certainly applies
to ...