Search
Now showing items 1-2 of 2
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Bridging the Gap Between Commissioning Measures and Large Scale Retrofits in Existing Buildings
(Energy Systems Laboratory, 2011-10)
Most often commissioning of existing buildings seeks to reduce a building’s energy consumption by implementation of operational changes via the existing equipment. In contrast, large scale capital retrofits seek to make ...