Building Pressure Control in VAV System with Relief Air Fan
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Continuous Commissioning® of an Office Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Case Study of Continuous Commissioning in an Office Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The case study building is a two-story office facility with total floor area of 31000 square feet, of which most is open space office. The HVAC system operates 24 hours a day, 7 days a week. An energy audit was conducted ...
VAV System Optimization through Continuous Commissioning in an Office Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
This paper demonstrates the implementation of new innovative technologies during continuous commissioning (CC®) practices to improve building operations and reduce energy costs. The case study building is a 5-story office ...
CCLEP Retrofit and Innovative Controls to Achieve 56% Energy Savings for a Luxury Shopping Mall
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
The Continuous Commissioning Leading Project (CCLEP) process is an ongoing process to apply Continuous Commissioning (CC) system optimization theory and advanced technologies in commercial retrofit projects. The CCLEP ...