Search
Now showing items 1-6 of 6
Joint-Frequency Bins versus Conventional Bin Weather Data in Analysis of HVAC System Operation
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
Often in simplified energy analysis the use of bin weather data is employed for a more time efficient and better organized analysis than using the full 8760-hour annual weather data. It has been suggested that joint-frequency ...
Restoration of Short Periods of Missing Energy Use and Weather Data Using Cubic Spline and Fourier Series Approaches: Qualitative Analysis
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The paper presents seventeen approaches that use
cubic splines and Fourier series for restoring short
term missing data in time series of building energy
use and weather data. The study is based on twenty
samples of hourly ...
Development of the Potential Energy Savings Estimation (PESE) Toolkit
(Energy Systems Laboratory (http://esl.tamu.edu), 2010-08)
This study has developed a prototype computer tool called the Potential Energy Savings Estimation (PESE) Toolkit. Baltazar’s methodology for potential energy savings estimation from EBCx/retrofit measures has been improved ...
Analysis of the Potential Energy Savings for 14 Office Buildings with VAV Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2010)
At the beginning of an existing building commissioning (EBCx)/energy retrofit project, some form of screening is usually applied to determine whether there is sufficient potential for savings to justify a formal EBCx ...
Use of First Law Energy Balance as a Screening Tool for Building Energy Use Data: Experiences on the Inclusion of Outside Air Enthalpy Variable
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
Quality controlled energy-use data is the foundation of energy performance evaluation for a building. The “Energy Balance Load” (EBL), a parameter derived from the first law of thermodynamics based on a whole-building ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...