Control Humidity With Single-Duct, Single-Zone, Constant Air Volume System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The lecture hall of the Richardson Petroleum
Building at Texas A&M University is a large lecture
hall, with a total floor area of approximately 2500 ft^2.
The lecture hall was served by a constant air volume
(CAV) air ...
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Joint-Frequency Bins versus Conventional Bin Weather Data in Analysis of HVAC System Operation
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
Often in simplified energy analysis the use of bin weather data is employed for a more time efficient and better organized analysis than using the full 8760-hour annual weather data. It has been suggested that joint-frequency ...
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
Monitoring and Verification Procedures Used in the Texas LoanSTAR and Rebuild America Programs
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
The monitoring and verification procedures that
have been developed for the Texas LoanSTAR
program and the ESL's Rebuild America Program
have become a foundation for a number of other state
and federal M&V programs, including ...
Accounting for the Occupancy Variable in Inverse Building Energy Baselining Models
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
The occupancy factor is often
underestimated in inverse modeling of building
energy use, or accounted for by grouping the
daily data in occupied and unoccupied groups
which are modeled separately. For instance, in
institutional ...
The Temperature and Relative Humidity Control in Cushing Library
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Cushing Library located on TAMU campus is a
special building, which needs precise temperature
and relative humidity control, because it stores a
number of rare collections and memorial books.
There are five air-handling ...