Search
Now showing items 1-10 of 70
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Program Overview: The Texas LoanSTAR Program; 1989-August 1997
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
The Texas LoanSTAR mans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum violation
escrow funds (PVE) from the ...
Report of Energy Efficiency Study and Metering/Utilities Profile for Electric Deregulation at Tarleton State University (TSU), Stephenville, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)
The director of Energy Management & Controls and staff at Tarleton State University (TSU) do a very good job of maintaining TSU and keeping expenses down. They have metering installed in many buildings and track the campus ...
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Development of Baseline Monthly Utility Models for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1996)
The Fort Hood Army base in central
Texas has more than 5,200 buildings and can be
considered as typical of large Department of
Defense Army bases in the continental United
States. The annual utility bill of the base ...
Environmental Impact of the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1998)
This paper presents an analysis of the
environmental impact of the energy reductions that
have been measured in the Texas LoanSTAR
program. There are a number of factors that
influence emission factors. The three major ...
Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
The Temperature and Relative Humidity Control in Cushing Library
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Cushing Library located on TAMU campus is a
special building, which needs precise temperature
and relative humidity control, because it stores a
number of rare collections and memorial books.
There are five air-handling ...