Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
Hydraulic Modeling of Large District Cooling Systems for Master Planning Purposes
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Results of CC Follow-Up in the G. Rollie White Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
An investigation into the increase of energy
consumption of G. Rollie White Coliseum was part
of the persistence project[1], which investigates the
savings in energy consumption of ten buildings that
were commissioned by ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
CC® of Retrofitted, Renovated, and Rented Systems and Equipment in Utilities Plants
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Using Simulation Models for District Chilled Water Distribution Systems Design
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The capital investment for the distribution system is often the most expensive portion of a district heating
and cooling system, which usually constitutes 50 to 70% of the total cost. Because of high initial cost, it is
very ...
Correcting Thermal Distribution Problems for a Large University Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Texas A&M University main campus in
College Station consists of 114 buildings served by
two central plants. The two main campus loops are
more than 50 years old with a total piping length for
each loop in excess of 13 ...
Maximizing Commercial Hydraulic Software Simulation in Thermal Distribution System Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)