Development of Baseline Monthly Utility Models for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), 1996-04)
The Fort Hood Army base in central Texas has more than 5,200 buildings and can be considered as typical of large Department of Defense Army bases in the continental United States. The annual utility bill of the base exceeds ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Measured Energy Use Indices for 27 Office Buildings
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
Energy use indices for 27 government office buildings are presented that have been assembled from hourly
monitored data as part of the Texas LoanSTAR program and other efforts at the Energy Systems Laboratory. These
indices ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2001 To Aug. 31, 2002
(2002-12)
This report presents electricity, natural gas and cooling baselines for the thermal plant,
buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline
analysis is also presented for the natural ...
Development of Baseline Monthly Utility Models, Stabilization of Data Logging Environment and Development of Metering Plan and Shopping List for Fort Hood, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
This report has been prepared for the United States Army Construction Engineering Research Laboratories (CERL) located at Champaign, IL. The report describes the work performed by the Energy Systems Laboratory (ESL) of ...
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
The Texas LoanSTAR (Loans to Save Taxes and Resources) program was conceived as a $98.6 million capital retrofit program for building energy efficiency. The funding source is petroleum violation escrow funds (PVE) from the ...
Prairie View A&M University Whole Campus Energy Analysis
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Prairie View A&M University started a large scale energy management program in 1987 and 1988. This
report presents an analysis of whole-campus energy consumption at the Prairie View A&M Campus where
whole-campus indices ...
Texas LoanSTAR Monitoring and Analysis Program—Monitoring and Advisory and Review Committee (January 1991)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
Program Overview: The Texas LoanSTAR Program; 1989-October 1999, A 10-Year Experience
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The Texas LoanSTAR (Loans to Save Taxes
and Resources) program was conceived as a $98.6
million capital retrofit program for building energy
efficiency. The funding source is petroleum
violation escrow funds (PVE) from the ...
Texas LoanSTAR Monitoring and Analysis Program Draft Plan
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1989)
Major objectives of the LoanSTAR Monitoring and Analysis Program
(MAP) are to:
verify energy and dollar savings of energy conservation
retrofits in state, school and local government
buildings;