Search
Now showing items 131-140 of 268
Economic and Conservation Evaluation of Capital Renovation Projects: United Irrigation District of Hidalgo County (United) - Rehabilitation of Main Canal, Laterals, and Diversion Pump Station - Preliminary
(Texas Water Resources Institute, 2005-09)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a three-component capital renovation project proposed by the United Irrigation District to the U.S. Bureau of ...
Field Demonstration of the Performance of Wastewater Treatment Solution (WTS®) to Reduce Phosphorus and other Substances from Dairy Lagoon Effluent
(Texas Water Resources Institute, 2009-01)
In 1998 two upper North Bosque River segments were designated as impaired due to point source and nonpoint source (NPS) pollution of phosphorus (P) in these segments of the watershed. As a result, two Total Maximum Daily ...
Extending and Condensing the Brazos River Basin Water Availability Model
(Texas Water Resources Institute, 2008-12)
The Water Availability Modeling (WAM) System developed and maintained by the Texas Commission on Environmental Quality includes the generalized Water Rights Analysis Package (WRAP) simulation model and WRAP input datasets ...
IC3 Resnet Accreditation User's Guide
(Energy Systems Laboratory (http://esl.tamu.edu), 2009-12)
This document is intended to provide the users from the Residential Energy Services Network (RESNET) with information on the supporting materials for the RESNET Accreditation of International Code Compliance Calculator ...
Lessons Learned from Continuous Commissioning® of a LEED Gold Building in Texas
(2008-09-22)
The subject building is a relatively new building with 120,000 square feet located in Texas and was the first LEED® Gold building in the area. To earn the title of a green building, the designers of this high performance ...
ESL Monthly Energy Consumption Report (MECR) Production Manual
(Energy Systems Laboratory (http://esl.tamu.edu), 2005-03)
Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT)
(Energy Systems Laboratory, 2009-01)
More than $18 billion of energy is wasted annually in the U.S. commercial building sector. Commissioning services have proven successful in reducing building energy consumption, but the optimal energy performance obtained ...
Identifying and Characterizing the Volume and Quality of Tributaries and Springs
(Texas Water Resources Institute, 2007-05)
In order to identify potential salinity sources, it was necessary to locate and characterize the
potential impact of perennial and intermittent tributaries into the Pecos River. A study to
determine water quantity, ...
Comparative Evaluation of Generalized River/Reservoir System Models
(Texas Water Resources Institute, 2005-04)
This report reviews user-oriented generalized reservoir/river system models. The terms reservoir/river system, reservoir system, reservoir operation, or river basin management "model" or "modeling system" are used synonymously ...
Fundamentals of Water Availability Modeling with WRAP
(Texas Water Resources Institute, 2005-04)