Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorWei, G.
dc.date.accessioned2005-07-25T21:05:34Z
dc.date.available2005-07-25T21:05:34Z
dc.date.issued1997
dc.identifier.otherTR-97-03-01
dc.identifier.urihttps://hdl.handle.net/1969.1/2170
dc.description.abstractThis report presents an analysis of the HVAC system at the Willow Branch Intermediate School for the MEEN 685 class project. The school is located at College Station, Texas. A portion of the school belonged to Oakwood Intermediate School which was built in 1983. It was recently expanded in 1994 and renamed the Willow Branch Intermediate School. It now has a total floor area of 88,617 square feet. The system under investigation is a water-loop heat pump system which provides the HVAC needs for the new building.en
dc.format.extent11305230 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu), Texas A&M University
dc.publisherDepartment of Mechanical Engineering, Texas A&M University
dc.rightsAll rights reserved by the Energy Systems Laboratory of Texas A&M and the authors.en
dc.subjectHVACen
dc.subjectenergy consumptionen
dc.subjectheat pumpen
dc.titleAnalysis of the HVAC System at the Willow Branch Intermediate Schoolen
dc.typeTexten


This item appears in the following Collection(s)

Show simple item record