Now showing items 1-3 of 3

    • Ferrari, Alexander; Battagli, Paolo; Rojas, Luis (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Summary: Problem Statement: Trim Balancing of multiple units may imply schedule impact. Solution: Develop a single-shot procedure to embed balancing activity in the general commissioning. Results: Flawless start-up of 5 ...
    • Deshpande, Atul; Rojas, Luis; Venkatachallam, V.; Chelghoum, Mustapha (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2013)
      Summary: After a planned Shutdown and transfer valve replacement, Propane unit -GT Fr7AE DLN1- started; Unit failed to transfer to pre-mix steady state Mode (PMSS) and Trip. 05 Days of online troubleshooting using Fishbone ...
    • Rojas, Luis; Ayoub, Akram; Corcoran, Joseph; Anderson, James; Wolford, Christian (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2013)