Now showing items 1-20 of 41

    • Ferrari, Alexander; Battagli, Paolo; Rojas, Luis (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Summary: Problem Statement: Trim Balancing of multiple units may imply schedule impact. Solution: Develop a single-shot procedure to embed balancing activity in the general commissioning. Results: Flawless start-up of 5 ...
    • Perez, Robert; Conkey, Andrew (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
    • Gad, Amr (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Outline: Introduction; Process overview; Compressor design & construction; Narrative of reverse rotation events; Cause of reverse rotation; Possible impacts of reverse rotation; Mitigating actions taken; Lessons learned; ...
    • Knight, Cliff; Corleto, Carlos (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Outline: Outline; Introduction & Background; Site Visits; Root Cause Failure Analysis; Failure Site Assessment; Mechanical, Metallurgical, Compressor Performance; Failure Scenario Assessment; Conclusions; Recommendations
    • Salisbury, Roy; Rasmussen, Pete; Griffith, Todd; Fibbi, Andrea (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Increasing demand for LNG has driven the requirement for a significant increase in LNG plant capacity. Qatargas II (QGII), a joint venture initiated by Qatar Petroleum, is committed to accomplish this while reducing ...
    • El-Abyouki, Mohamed; Guerrero, Armando (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Background; Problem Identification; Analysis; Scope; Testing; Conclusions
    • Al-Qattan, Aziz; Marscher, William; Savage, Andrew; Olson, Eric (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Outline: Problem description and approach overview. Specialized testing to characterize the problem. Conclusions and recommendations based on the test results. Implementing the solution. Lessons learned.
    • Al-Ajji, Abdulbasit (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      As part of the Upgrade project of 1998/99 the Main Oil line (MOL) pumps were replaced with smaller pumps from NUOVA PIGNONE (NP), due to Three-phase separation. The new pumps were installed with John Crane (JC) Double ...
    • Cicatelli, Giancarlo; Schiavello, Bruno (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Summary: The case. Initial analysis. Root cause analysis. Solution implementation. Results. Conclusions.
    • Patel, Vinod; Kimmel, Hans (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      From the earliest days of gas liquefaction, the thermodynamic process advantage of employing cryogenic liquefied gas expanders in place of throttling valves was very well recognized. The available technology was unable ...
    • Mekawey, Sherif (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Background: The synthesis Gas Compressor was recently overhauld. Replaced the IP Compressor ortor, interstage seals and floating seal rings. Replaced the inboard radial and thrust bearings of IP Compressor. When the machine ...
    • Zeidan, Fouad (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Bearings constitute one of the most critical components in turbo and rotating machinery today. Their influence on the rotordynamic performance, life, and reliability of the machine cannot be ignored. Many of the problems ...
    • Bridon, Raphael; Lebigre, Oliver (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Design of seals and sealing systems requires multidisciplinary skills and deep understanding of interactions between the seals and its environment. This paper proposes to present typical gas seals contaminants and ...
    • Mutasim, Zaher (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      The performance and durability of industrial gas turbines are strongly dependent on the operating conditions and the environment in which they function at. Engine performance and durability must be equally considered ...
    • Al-Hajri, Mohammed (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      To share with you Abqaiq Plants’ successful experience in resolving a high vibration problem on a Gas Turbine Load Gearbox
    • Ehlert, Don (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Oil mist lubrication is a proven and environmentally clean technology for the lubrication of rotating equipment in process industries. The use of oil mist lubrication has grown dramatically worldwide delivering increased ...
    • Al-Dhafiri, Amer; Al-Shuhail, Yousuf; Al-Odan, Nabeel (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Low flow operation is a well-known cause of centrifugal pump failures and thus it is a custom to have low flow protection. On the other hand, protecting pumps from excessively high flow is usually not considered during ...
    • Schmied, Joachim; Pozivil, Josef (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      HOT SPOTS IN TURBOEXPANDER BEARINGS: DESCRIPTION OF THE MACHINE. ROTORDYNAMIC BEHAVIOR (ANALYSIS AND TEST). THE HOT SPOT PHENOMENON. ANALYSED AND TESTED MODIFICATIONS. CONCLUSIONS
    • Kocur, John; Muench, Maximilian (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      The popularity of VFD motors in compressor trains has increased in recent years. Increased process flexibility is a primary consideration for implementation of VFD systems. However, this comes at a cost of increased ...
    • Bidaut, Yves; Baumann, Urs (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2011)
      Background: 2 parallel trains consisting of a Low Pressure (LPC) and High Pressure (HPC) compressors were supplied for an offshore reinjection application near the coast of Angola. During the commissioning on site large ...