Search
Now showing items 1-4 of 4
Continuous Commissioning of the Reynolds Army Community Hospital, Fort Sill, Oklahoma
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2007)
Continuous Commissioning® (CC®) of the Reynolds Army Community Hospital facility was a two phase project. The first phase consisted of a point-to-point verification of a newly upgraded Energy Management Control System ...
Statewide Air Emissions Calculations from Wind and Other Renewables, Summary Report
(2007-10-30)
The 79th Legislature, through Senate Bill 20, House Bill 2481 and House Bill 2129, amended Senate Bill 5
to enhance its effectiveness by adding 5,880 MW of generating capacity from renewable energy
technologies by 2015, ...
Continuous Commissioning of Public Schools
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
Continuous Commissioning (CC) is a proven, highly cost-effective process that can improve building comfort and reduce energy consumption. This paper discusses the CC of three public schools in Austin, Texas. These schools ...
Continuous Commissioning of a Medical Research Facility
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2007)
This paper presents a case study for Continuous Commissioning® (CC®)of a 520,000 square foot medical research facility. All of the primary energy using systems in the building were investigated to determine their existing ...