Search
Now showing items 1-10 of 10
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume I – Summary Report, Annual Report to the Texas Commission on Environmental Quality September 2002 – August 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) ...
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan (TERP), Volume II – Technical Report, Annual Report to the Texas Commission on Environmental Quality September 2002 – August 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
The Energy Systems Laboratory (Laboratory) is pleased to provide our second annual report, Energy Efficiency/Renewable Energy Impact in the Texas Emissions Reduction Plan to the Texas Council on Environmental Quality (TCEQ) ...
Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
Calculation of NOx Emission Reduction from Implementation of the 2000 IECC/IRC Conservation Code in Texas
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
Four areas in Texas have been designated by the
United States Environmental Protection Agency
(EPA) as non-attainment areas because ozone
levels exceed the National Ambient Air Quality
Standard (NAAQS) maximum allowable ...
How Much Can a Campus Save on Utility Bills by Turning a 5-Workday Week Into a 4Workday Week
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The recent budget cuts campaign mandated
by the governor's office had all state agencies in
Texas looking for ways to reduce revenue
spending. One of the cost savings opportunities
perceived by many university officials ...
Improving Control of a Dual-Duct Single-Fan Variable Air Volume Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
This paper discusses improved control strategies
for dual-duct single-fan variable air volume (VAV)
systems. Common control strategy for supply air
volume modulation is evaluated, and an improved air
volume control strategy ...
Procedure to Calculate NOx Reductions Using the Emissions & Generation Resource Integrated Database (E-Grid) Spreadsheet
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
In this report a detailed description of the procedure to calculate NOx reductions from energy savings due to the 2000 IECC code implementation in single family residences using the United States Environmental Protect ...
Continuous Commissioning® of the Matheson Courthouse in Salt Lake City, Utah
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Utah Energy Office, located in the Department
of Natural Resources (DNR), Utah Department of
Facilities Construction and Management (DFCM),
and engineers from the Energy Systems Laboratory at
Texas A&M University teamed ...
U. S. Army Measurement and Verification (M&V) Costing Toolkit
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This is the 2003 final report for the U.S. Army Monitoring and Verification (M&V) costs project. The purpose of this project is to develop a M&V Costing Toolkit to be used by the government or third party planners to design ...