Continuous Commissioning® of a Modern Central Utility Plant
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
The Temperature and Relative Humidity Control in Cushing Library
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Cushing Library located on TAMU campus is a
special building, which needs precise temperature
and relative humidity control, because it stores a
number of rare collections and memorial books.
There are five air-handling ...
Continuous Commissioning of Salt Lake Community College South City Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to
demonstrate the feasibility of the Continuous Commissioning® (CC®)1 process. The two sites selected were a modern state
building, ...
Eliminating Humidity and Condensation Problems in University Dormitories - Case Study
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2002)
Krueger Hall, McFadden Hall and Rudder Hall are
dormitories used for housing on-campus students of
Texas A&M University (TAMU). These halls have
suffered with humidity problems for many years.
The Continuous Commissioning ...
Simulation and Optimization on Power Plant Operation Using Sega's EOP Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The operation of a cogeneration power plant is
complicated. The Energy Optimization Program
(EOP, software made by SEGA, Inc.) was designed
to simulate and optimize the operation of TAMU
power plant. All major plant ...
Commissioning of A Large Office Building in Texas - A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
This case study involves commissioning of a
large office building in the hot and humid climate of
south Texas. The commissioning involved the
installation of a VFD (Variable Frequency Drive) on
a chilled water pump, improved ...