The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
A Study of the Advanced Systems at the CMU Intelligent Workplace with an Evaluation of Potential Applications to Texas A&M International University
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...
A Twelve Year, $10 Million Energy Initiative Marching On: the Texas A&M University Campus Energy Systems CC®
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The $58.5 million in measured savings for the twelve-year, $10 million continuous commissioning®
(CC®) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with ...
Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
Lessons Learned from Continuous Commissioning® of a LEED Gold Building in Texas
(2008-09-22)
The subject building is a relatively new building with 120,000 square feet located in Texas and was the first LEED® Gold building in the area. To earn the title of a green building, the designers of this high performance ...
Airside Economizer- Comparing Different Control Strategies and Common Misconceptions
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...
Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX
(2008-09-22)
The Robert E. Johnson State Office building is a 5-story, 303,389 square foot office building built in 2000 located in downtown Austin, TX. The original building design included a number of energy conservation measures ...
Airside Economizer – Comparing Different Control Strategies and Common Misconceptions
(Energy Systems Laboratory, 2008-12)
Air-side economizer is broadly adopted in building HVAC design and operations. When the system is properly designed and the control sequence is properly implemented, air-side economizer provides significant energy savings. ...
Commissioning Lessons from Study of the Advanced Systems at the CMU Intelligent Workplace
(2008-04)
A detailed study has been conducted of the performance of several innovative aspects of the Intelligent Workplace (IW) at Carnegie Mellon University, a low energy consumption building that uses radiant heating, cooling and ...