Search
Now showing items 1-2 of 2
Eliminating Humidity and Condensation Problems in University Dormitories - Case Study
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2002)
Krueger Hall, McFadden Hall and Rudder Hall are
dormitories used for housing on-campus students of
Texas A&M University (TAMU). These halls have
suffered with humidity problems for many years.
The Continuous Commissioning ...
Rehabilitation of Secondary Heating and Cooling Systems - Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Continuous Commissioning (CCSM) was performed
on the Texas A&M Large Animal Hospital in
October 1996 and as a result, significant savings were
achieved. Subsequently, the building chilled water
and hot water energy consumption ...