Search
Now showing items 1-5 of 5
Eliminating Humidity and Condensation Problems in University Dormitories - Case Study
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2002)
Krueger Hall, McFadden Hall and Rudder Hall are
dormitories used for housing on-campus students of
Texas A&M University (TAMU). These halls have
suffered with humidity problems for many years.
The Continuous Commissioning ...
The Chilled Water and Hot Water Building Differential Pressure Setpoint Calculation - Chilled Water and Hot Water Pump Speed Control
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
More and more variable frequency devices (VFD)
are being installed on the chilled water and hot water
pumps on the TAMU campus. Those pump speeds
are varied to maintain chilled water or hot water
building deferential ...
Chiller Start/Stop Optimization for a Campus-wide Chilled Water System with a Thermal Storage Tank Under a Four-Period Electricity Rate Schedule
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The existence of a 1.4-million-gallon
chilled water thermal storage tank greatly
increases the operational flexibility of a campuswide
chilled water system under a four-part
electricity rate structure. While significant
...
Exploring Maximum Humidity Control and Energy Conservation Opportunities with Single Duct Single Zone Air-Handling Units
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Humidity control for single-duct single-zone (SDSZ) constant volume air handling units is known to be a challenge. The operation of these systems is governed by space temperature only. Under mild weather conditions, discharge ...
Rehabilitation of Secondary Heating and Cooling Systems - Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Continuous Commissioning (CCSM) was performed
on the Texas A&M Large Animal Hospital in
October 1996 and as a result, significant savings were
achieved. Subsequently, the building chilled water
and hot water energy consumption ...