Search
Now showing items 91-100 of 236
Water/Wastewater Engineering Report (High Efficiency Pump/Motor Replacement - M2 Model)
(2006-10-30)
Pumping water or wastewater is the largest use of electricity for a municipal water supply or wastewater treatment plant. Increasing the overall efficiency of the pumping system can achieve significant energy savings. ...
Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests, Final Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2000)
This is the final report for ASHRAE Research Project 1004-RP: Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests. This report presents the results of the development and application of the ...
Determining Long-Term Performance of Cool Storage Systems from Short-Term Tests; Literature Review and Site Selection, Nov. 1997 (Revised Feb. 1998)
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1997)
This is the preliminary report contains the literature review and site selection recommendations for ASHRAE Research Project RP 1004 — "Determining Long-term Performance of Cool Storage Systems From Short-term Tests".
Monthly Indices: A Procedure for Energy Use Display Creating Monthly Indices for Comparing the Energy Consumption of Buildings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This technical paper describes the construction of comparative monthly energy and weather indices for buildings and their usefulness in simple comparisons across sites. These graphs show monthly electric and natural gas ...
Analysis of Energy Conservation Options for USDOE Child Development Center
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
The Child Development Center (CDC) was designed to be a "showpiece" model building. Its construction included energy efficient features, including a photovoltaic system, solar hot water system, energy efficient lighting, ...
Use of Energy Management and Control Systems for Performance Monitoring of Retrofit Projects: Preliminary Engineering Survey, USDOE Forrestal and Germantown Facility, Summary Report, USDOE Office of Conservation and Energy
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1991)
The purpose of this preliminary engineering survey of the USDOE Forrestal and Germantown
facilities is to determine whether existing EMCSs can be used for monitoring energy retrofits, and in
the case where this is not ...
The Great Building Energy Predictor Shootout II: Measuring Retrofit Energy Savings
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1995)
Preliminary Study of Advanced Diagnostic Prescreening Methods
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
A Survey of High Performance Schools
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Rebuild America Program – Brazos Valley Energy Conservation Coalition – Quarterly Report for July – September 1998
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1998)
The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the U.S. Department of Energy ...