Continuous Commissioning® Opportunities in Hospital and Laboratory Facilities
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
This paper compiles the Continuous Commissioning® (CC®) costs, savings, and opportunities implemented in 20 hospital and laboratory commissioning projects involving 48 buildings. The potential savings and costs from 25 CC ...
Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
A Ten-Year, $7 Million Energy Initiative Marching on: Texas A&M University Campus Energy Systems CC
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
The $35 million in measured savings for the ten-year, $7 million continuous commissioning (CC) program at the Texas A&M University (TAMU) makes the decision to continue easy. In today's energy environment and with the ...
Hydraulic Modeling of Large District Cooling Systems for Master Planning Purposes
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Results of CC Follow-Up in the G. Rollie White Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
An investigation into the increase of energy
consumption of G. Rollie White Coliseum was part
of the persistence project[1], which investigates the
savings in energy consumption of ten buildings that
were commissioned by ...
Improving Boiler Efficiency Modeling Based On Ambient Air Temperature
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Optimum economic operation in a large
power plant can cut operating costs substantially.
Individual plant equipment should be operated
under conditions that are most favorable for
maximizing its efficiency. It is widely ...
Improving Control of a Dual-Duct Single-Fan Variable Air Volume Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
This paper discusses improved control strategies
for dual-duct single-fan variable air volume (VAV)
systems. Common control strategy for supply air
volume modulation is evaluated, and an improved air
volume control strategy ...
Measured Energy Use Indices for 27 Office Buildings
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2001)
Energy use indices for 27 government office buildings are presented that have been assembled from hourly
monitored data as part of the Texas LoanSTAR program and other efforts at the Energy Systems Laboratory. These
indices ...
A Method for Simulating Heat Recovery Systems Using AirModel in Implementations of the ASHRAE Simplified Energy Analysis Procedure
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)
Replacing Inefficient Equipment - An Engineering Analysis to Justify Purchasing A More Efficient Chiller
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2005)