Now showing items 1-6 of 6

    • Welsh, J.; Coffeen, W. G., III (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1983)
      This paper is a review of one of America's premier coal gasification installations. The caterpillar coal gasification facility located in York, Pennsylvania is an award winning facility. The plant was recognized as the ...
    • Causilla, H.; Kasprik, A. J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1982)
      A 400 MW oil-fired boiler was fitted with new burner guns and accessories to burn coal/oil mixture (COM) for a 120 full-power burn-day demonstration. Coal unloading and storage, and COM preparation and storage facilities ...
    • Abernethy, D. (Energy Systems Laboratory (http://esl.tamu.edu), 1986-06)
      Since the “Energy Crisis” Evaporative Roof Cooling Systems have gained increased acceptance as a cost effective method to reduce the high cost of air conditioning. Documented case histories in retro-fit installations show ...
    • Smith, M. (Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1987-09)
      In most operations, cooling towers are not purposely overlooked by Plant Personnel. However, the lack of knowledge about their importance prevents energy managers from making intelligent, informed decisions. This paper ...
    • Guard, R. F. W. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1982)
      The town of Hearst in northern Ontario is the location of many forest product industries. One enterprising manufacturer of plywood and particleboard found that his daily production of waste almost exactly equaled in energy ...
    • Duran Sierra, Guillermo Fidel (2019-07-16)
      Offshore pipeline route selection is a multidisciplinary engineering task to determine the best alternative route by taking into account spatial project constraints, geohazards, safety procedures, environmental conditions, ...