Now showing items 1-6 of 6

    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Zickefoose, B.; Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu), 2001-05)
      In early 1998 Thomas R. Theising, BASF Corporate Engineering initiated the formation of a motor management team. The goal of the team was to develop a Motor Management Guideline to better manage the purchase and repair of ...
    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2008)
      During the first half of 2007, a dozen Energy Survey's were completed at newly acquired BASF manufacturing facilities within the U.S. More than 500 energy conservation opportunities were identified. I have categorized these ...
    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2012)
      Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power quality problems present themselves in a variety of fashions, many of which cause process ...
    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2011)
      Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power quality problems present themselves in a variety of fashions, many of which cause process ...