Browsing by Author "Zhu, Y."
Now showing items 21-27 of 27
-
Zhu, Y.; Bryant, J.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)The physical plant director and staff at Texas A&M University - Kingsville (TAMU-K) do a very good job of maintaining TAMU-K facilities and keeping expenses down. During our visit, however, we were able to identify several ...
-
Zhu, Y.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)The physical plant director at Texas A&M University - Texarkana (TAMU-T) does a very good job of maintaining TAMU-T facilities and keeping expenses down. During our visit, however, we were able to identify several opportunities ...
-
Zhu, Y.; Bryant, J.; Turner, W. D.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 1999)The physical plant director and staff at West Texas A&M University (WTAMU) do a very good job of maintaining WTAMU facilities and keeping expenses down. During our visit, however, we were able to identify several opportunities ...
-
Haberl, J. S.; Verdict, M.; Yazdani, B.; Zhu, Y.; Im, P. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2004)The Energy Systems Laboratory (ESL) at the Texas Engineering Experiment Station, Texas A&M University System was contacted by Mr. Peter Bella of the Alamo Area Council of Governments (AACOG) to help document large-scale, ...
-
Zhu, Y.; Batten, T.; Turner, W. D.; Claridge, D. E.; Liu, M. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2000)For many modem buildings, the chilled water loops and risers are equipped with variable speed pumping systems. How to quickly balance the loop or riser to satisfy the cooling requirement and reduce energy consumption is a ...
-
Liu, M.; Abbas, M.; Zhu, Y.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)A new terminal box operation and control strategy, airflow reset, is developed to improve building comfort and energy efficiency during unoccupied and lightly occupied hours. The airflow reset lowers the minimum airflow ...
-
Liu, M.; Zhu, Y.; Claridge, D. E. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1996)In most chiller and boiler central plants, the energy management and control systems (EMCS) monitor and record key operation parameters and energy production continuously. A method was developed to identify potential O&M ...