Circulating Fluidized Bed Combustion Boiler Project

No Thumbnail Available

Date

1984

Journal Title

Journal ISSN

Volume Title

Publisher

Energy Systems Laboratory (http://esl.tamu.edu)
Texas A&M University (http://www.tamu.edu)

Abstract

The project to build a PYROFLOW circulating fluidized bed combustion (FBC) boiler at the BFGoodrich Chemical Plant at Henry, Illinois, is described. This project is being partially funded by Illinois to demonstrate the feasibility of utilizing high-sulfur Illinois coal. Design production is 125,000 pounds per hour of 400 psig saturated steam. An Illinois EPA construction permit has been received, engineering design is under way, major equipment is on order, ground breaking occurred in January 1984 and planned commissioning date is late 1985. This paper describes the planned installation and the factors and analyses used to evaluate the technology and justify the project. Design of the project is summarized, including the boiler performance requirements, the PYROFLOW boiler, the coal, limestone and residue handling systems and the pollutant emission limitations.

Description

Keywords

Circulating Fluidized Bed Combustion Boiler, High Sulfur Coal, Coal Burning Technology, Environmental Considerations, Economics

Citation