Show simple item record

dc.creatorBeasley, Rodney Craig
dc.date.accessioned2012-06-07T22:54:54Z
dc.date.available2012-06-07T22:54:54Z
dc.date.created1999
dc.date.issued1999
dc.identifier.urihttps://hdl.handle.net/1969.1/ETD-TAMU-1999-THESIS-B43
dc.descriptionDue to the character of the original source materials and the nature of batch digitization, quality control issues may be present in this document. Please report any quality issues you encounter to digital@library.tamu.edu, referencing the URI of the item.en
dc.descriptionIncludes bibliographical references (leaves 169-174).en
dc.descriptionIssued also on microfiche from Lange Micrographics.en
dc.description.abstractThe development of the energy services industry and the implementation of energy savings retrofits by energy services companies has increased the focus on the performance of energy saving retrofits. Energy savings measurement, though not an exact science, has been developing as well to ensure the benefit of a retrofit and to provide a level of assurance for the customers of energy services companies. This thesis presents a useful methodology for datelining campus utility usage using regression modeling techniques and measured daily data for the purpose of measuring energy savings. The methodology of this thesis improves upon previous regression modeling of individual buildings by extending commercial building energy usage models to an entire campus, modeling the operation of a central plant, and modeling central plant equipment performance with regression models. By adding equipment production layers, the user can more easily determine the cause of changes in the primary energy usage of a central plant. The case study for the application of the methodology of this thesis was the Texas A&M University main campus central plant. Useful results were obtained by utilizing one portion of the data to develop an energy usage baseline model and using the second portion of the data to validate the performance of the baseline model. Further development of the methodology could include the addition of an economic module and refinement of the model to incorporate the use of hourly data.en
dc.format.mediumelectronicen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherTexas A&M University
dc.rightsThis thesis was part of a retrospective digitization project authorized by the Texas A&M University Libraries in 2008. Copyright remains vested with the author(s). It is the user's responsibility to secure permission from the copyright holder(s) for re-use of the work beyond the provision of Fair Use.en
dc.subjectmechanical engineering.en
dc.subjectMajor mechanical engineering.en
dc.titleA Methdology for Baselining the Energy Use at Large Campus Utility Plants for the Purpose of Measuring Energy Savings from Energy Conservation Retrofitsen
dc.typeThesisen
thesis.degree.disciplinemechanical engineeringen
thesis.degree.nameM.S.en
thesis.degree.levelMastersen
dc.type.genrethesisen
dc.type.materialtexten
dc.format.digitalOriginreformatted digitalen


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record

This item and its contents are restricted. If this is your thesis or dissertation, you can make it open-access. This will allow all visitors to view the contents of the thesis.

Request Open Access