Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley (Hidalgo County Irrigation District No. 1)
Abstract
A Case Study Using Actual Construction Costs for the Curry Main Pipeline Project, Hidalgo County Irrigation District No. 1 (Edinburg)
Collections
Citation
Lacewell, R. D.; Rister, M.; Sturdivant, A. W. (2005). Validating the Estimated Cost of Saving Water Through Infrastructure Rehabilitation in the Texas Lower Rio Grande Valley (Hidalgo County Irrigation District No. 1). Texas Water Resources Institute. Available electronically from https : / /hdl .handle .net /1969 .1 /94968.