Search
Now showing items 1-10 of 323
The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part II Availability of Flow and Water Quality Data for the Rio Grande Project Area
(Texas Water Resources Institute, 2009)
This report fulfills the deliverables required by the cooperative agreement between the U.S.
Army Corps of Engineers and Texas AgriLife Research (TAES/03-PL-02: Modification No.
3) on behalf of the Paso del Norte Watershed ...
The Development of a Coordinated Database for Water Resources and Flow Model in the Paso Del Norte Watershed (Phase III) Part I Lower Rio Grande Flood Control Model [LRGFCM] RiverWare Model Development
(Texas Water Resources Institute, 2009)
This report fulfills the deliverables required by the cooperative agreement between the U.S.
Army Corps of Engineers and Texas AgriLife Research (TAES/03-PL-02: Modification No.
3) on behalf of the Paso del Norte Watershed ...
Education Program for Improved Water Quality in Copano Bay Task Two Report
(Texas Water Resources Institute, 2009)
The Education Program for Improved Water Quality in Copano Bay is funded through a Clean Water Act §319(h) Nonpoint Source Grant from the Texas State Soil and Water Conservation Board (TSSWCB) and the U.S. Environmental ...
Saving public resources: Tips for conserving energy and water in home and landscapes
(Texas Water Resources Institute, 2009)
Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 2 (San Juan) - 48" Pipeline Replacing Wisconsin Canal - Final
(Texas Water Resources Institute, 2003-07)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 2, (a.k.a. San ...
Estimation of Recharge to the Middle Trinity Aquifer of Central Texas Using Water-Level Fluctuations
(Texas Water Resources Institute, 2001-10)
A 23-site monitoring well network located in the Trinity Aquifer region of Central Texas, with all wells penetrating the Middle Trinity Aquifer, was used with available values of aquifer storativity and specific yield to ...
Impacts of Recreational and Commercial Fishing and Coastal Resource-Based Tourism on Regional and State Economies
(Texas Water Resources Institute, 2001-05)
This study estimates the regional and statewide economic impacts of recreational and commercial fishing and bay and estuary related recreational activities in the six bay and estuary systems along the Texas Gulf Coast.
The ...
Quality and Membrane Treatability of the Lake Houston Water Supply
(Texas Water Resources Institute, 2001-10-01)
Currently, sections of Harris and Montgomery counties located North and Northeast of Houston use groundwater almost exclusively. These areas have witnessed substantial population growth and associated increases in water ...
Economic and Conservation Evaluation of Capital Renovation Projects: Hidalgo County Irrigation District No. 1 (Edinburg) - North Branch / East Main - Final
(Texas Water Resources Institute, 2003-10)
Initial construction costs and net annual changes in operating and maintenance expenses are identified for a single-component capital renovation project proposed by Hidalgo County Irrigation District No. 1 to the Bureau ...
Demonstration of the Rapid Assessment Tool: Analysis of Water Supply Conditions in the Harlingen Irrigation District
(Texas Water Resources Institute, 2008-11)
RAT (Rapid Assessment Tool), currently under development, is a combination of surveys, data collection, mapping and limited direct measurement designed to provide a quick and cost-effective analysis of the conditions of ...