Search
Now showing items 51-60 of 3597
Discussion Group P3 On Bearings and Lubrication
(Texas A&M University. Turbomachinery Laboratories, 2011)
Discussion Group T4 On Overspeed Trip Systems
(Texas A&M University. Turbomachinery Laboratories, 2011)
Torsional and Electrical Dynamic Interactions of Compressor Drive Motors and Gas Turbine Driven Power Generators
(Texas A&M University. Turbomachinery Laboratories, 2013)
Load induced power fluctuations in a pair of synchronous motor driven reciprocating compressor trains have been shown to interact with a gas turbine driven power generation source. Electrical current pulsations predicted ...
Noise Trouble Shooting on a Variable Speed Planetary Gear Application for Off-Shore Process Gas Compressor
(Texas A&M University. Turbomachinery Laboratories, 2012)
The Persistence of Retro-commissioning Savings in Ten University Buildings
(Energy Systems Laboratory, 2011-10-01)
A study was performed to evaluate how well energy savings persisted over time in ten university buildings that underwent retro-commissioning in 1996. Total annualized savings for all buildings in 1997 were 45(±2)% for ...
How Important Are The Protection Systems & Valve Design That Can Contribute To The Equipment Integrity On Reciprocating Compressors
(Texas A&M University. Turbomachinery Laboratories, 2012)
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Monitoring Electricity Consumption in the Tertiary Sector- A Project within the Intelligent Energy Europe Program
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
The electricity consumption in the tertiary sector in the EU is still increasing and a further increase is expected of more than 2 % per year during the next 15 years. This sector includes companies and institutions of ...
Simulated Energy Savings Comparison Between Two Continuous Commissioning® Methods Applied to a Retrofitted Office Building
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® (CC®) was performed on a 24,446 square foot institutional building used primarily to house offices and conference rooms. The building was constructed in 1950, and then had a complete Heating, ...
Green Building Performance Evaluation in the United States: Measured Results from LEED- New Construction Buildings
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Is the Leadership in Energy and Environmental Design program (LEED) delivering actual energy savings? This study addresses that question with a post-occupancy assessment of 121 LEED buildings across the United State. Input ...