Evaluating Transformer Losses
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
This paper outlines how to determine what transformer losses cost and how to evaluate transformer bids to optimize the investment.
Making Use of Pinch: A Contractors Experience
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
The recent turnaround in the chemical industry has meant that contractors are once again competing vigorously for new plant orders. This has meant plant designs have required rapid evaluation and where necessary improvement ...
Energy Management at Steelcase- Energy Integrated with Facilities
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
Our plant assigned and central engineers are encouraged to design each project with energy efficiency and cost as important objectives. It is their contribution to the process of problem solving, renovation, equipment ...
Waste Minimization- The Challenge of the 90's
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
Waste minimization is an
environmental good news story that Dow
enjoys going out and talking about.
The purpose of this paper is to
introduce you to Dow's Waste Reduction
Program. First, some background
information ...
What Marketing Strategies Make Sense for Utilities
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
A number of pressures are being placed on the electric utility industry to develop much closer relationships with customers and key allies. Some of these pressures include: 1. The threat of rising marginal costs, 2. New ...
Innovative Ratemaking- A Competitive Necessity
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
The electric utility industry is undergoing fundamental changes in the way that new generation capacity may be provided and in the way that electric power is sold to large industrial customers. These changes are increasingly ...
OG&E's Power Quality Program
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
Our commitment to reliable electric power does not stop at the meter, but extends all the way to the equipment that it operates. Through the Power Quality Program, we provide professional power consultants to assure that ...
Real-Time Pricing of Electricity: An Assessment
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
Increasing competitive pressures, advances in technology, interest in deregulation, new planning strategies, and dissatisfaction with present rate designs have encouraged the recent development of a number of new electric ...
Production Cost Modeling of Cogenerators in an Interconnected Electric Supply System
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
The Optimal State Electricity Supply System in Texas (OSEST) research project is part of the continuing Public Utility Commission of Texas (PUCT) effort to identify possible improvements in the production, transmission, ...
The Cogeneration Plant: Meeting Long-Term Objectives
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1989-09)
In order to meet economic objectives of cogeneration projects, reliable operation must be achieved. The key to successful operation is proper preparation beginning at the economic justification stage and continuing through ...