dc.description.abstractAs part of the LoanSTAR program, Victoria High School in Victoria, Texas underwent two retrofits: a) an absorption chiller was changed to an electric vapor compression chiller, and b) an EMCS system was installed after about 5 months in the post retrofit period. Moreover, retrofit savings calculation was complex since pre-retrofit data consisted of only monthly utility data while hourly monitored data are available for the post-retrofit period. This report describes the method in which we have performed retrofit energy and demand savings in Victoria High School. A previous report described the procedure adopted when no pre-retrofit data are available. We have only used Unnormalized Utility Bills Comparison ,or the Level-0 approach to determine electricity (energy and demand) and gas energy savings for VHS.en
dc.format.extent3144833 bytesen
dc.format.mimetypeapplication/pdf
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory (http://esl.tamu.edu), Texas A&M University
dc.publisherDepartment of Mechanical Engineering, Texas A&M University
dc.rightsAll rights reserved by the Energy Systems Laboratory of Texas A&M and the authors.en
dc.subjectLoanSTARen
dc.subjectEMCSen
dc.subjectretrofit energy savingsen
dc.titleCalculating Energy and Demand Retrofit Savings for Victoria High School: Interim Reporten