dc.contributor | Middle Eastern Turbomachinery Symposium (1st : 2011) | |
dc.creator | Rayan, Samy Abou | |
dc.date.accessioned | 2018-10-12T19:27:12Z | |
dc.date.available | 2018-10-12T19:27:12Z | |
dc.date.issued | 2011 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/172569 | |
dc.description | Case Study | en |
dc.description.abstract | Qatar fertilizer company operates a huge fertilizer complex that manufactures Ammonia and Urea with a total capacity of 2 & 3 million tons each, being the world’s largest single site producer of Urea. The facility has four trains commissioned in stages since 1973.
ØThe synthesis gas compressor installed in Ammonia 1 & 2 plants consists of two trains ; the low & intermediate pressure casings are driven by two back pressure and condensing steam turbines , the high pressure casing is driven by Gas turbine (fig.1). | en |
dc.format.medium | Electronic | en |
dc.format.mimetype | application/pdf | |
dc.language.iso | en | |
dc.publisher | Turbomachinery Laboratory, Texas A&M Engineering Experiment Station | |
dc.relation.ispartof | Middle East Turbomachinery Symposia. 2011 Proceedings. | en |
dc.subject.lcsh | Turbomachines | en |
dc.title | SOLVING SYNTHESIS GAS HIGH PRESSURE COMPRESSOR VIBRATION INSTABILITY | en |
dc.type.genre | conference publication | en |
dc.type.material | Text | en |
dc.format.digitalOrigin | born digital | en |