Search
Now showing items 1-2 of 2
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
Texas LoanSTAR Program Savings Calculation Workbook
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This is the report and manual for the Texas LoanSTAR Program Savings Calculation Workbook. The purpose of this report is to document the Texas LoanSTAR Program Savings Calculation Workbook to be used by the State Energy ...