Search
Now showing items 1-9 of 9
Building Energy Use and Conservation in Cycle VIII of the Texas Institutional Conservation Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1986)
Sixty-two technical assistance (energy audit)
reports by twelve different consulting firms representing
fifteen independent school districts, nine
hospitals, and five colleges have been reviewed to
assess energy use ...
Energy Management Degree Specialization at Texas A&M University
(Energy Systems Laboratory (http://esl.tamu.edu), 1984-04)
The Department of Mechanical Engineering at Texas A&M offers unique degree programs with a specialization in energy management. The most popular of the degree offered is a professional degree, the Master of Engineering, ...
Cogeneration System Analysis Summary Reports for Austin State Hospital, Austin, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1985)
Cogeneration System Analysis Summary Reports for Texas Woman’s University, Denton, Texas
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1985)
Updating Texas Energy Cost Containment Audit Reports
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1989)
In 1984 and 1986, 35.3 million square feet of
state owned buildings were audited to identify
cost saving retrofit projects. Originally
intended for direct legislative funding or bond
sales, funding became available in 1989 ...
Audit Costs for the 1986 Texas Energy Cost Containment Program
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 1987)
Direct program costs for detailed audits of
13.5 million square feet of institutional building
space in the 1986 Texas Energy Cost Containment
Program were $0.047/SF. The building area was 63
percent simple (offices, ...
Texas LoanSTAR Monitoring and Analysis Program Draft Plan
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1989)
Major objectives of the LoanSTAR Monitoring and Analysis Program
(MAP) are to:
verify energy and dollar savings of energy conservation
retrofits in state, school and local government
buildings;
reduce energy costs by ...
Energy Systems Group Annual Report
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1986)
First Year Analysis of Industrial Energy Conservation in Texas A&M's Energy Analysis and Diagnostic Center Program
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1988-09)
Texas A&M University's Energy Analysis and
Diagnostic Center (EADC) performed 15 energy
audits of small- to medium-size manufacturing
plants during its first year. The EADC program
is funded by the United States ...