Search
Now showing items 1-3 of 3
An Evaluation of Energy-Saving Retrofits from the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report discusses the LoanSTAR retrofit savings through December 1993 with an emphasis on the Constant Volume to Variable Air Volume air-handler retrofits. The report also summarizes several key findings about the ...
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...
A Study of Diagnostic Pre-Screening Methods for Analyzing Energy Use of K-12 Public Schools
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report has been prepared for the Office of Buildings and Community Systems at the United States Department of Energy through the Existing Building Efficiency Research Program at Oak Ridge National Laboratory. The ...