Search
Now showing items 1-2 of 2
An Evaluation of Energy-Saving Retrofits from the Texas LoanSTAR Program
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
This report discusses the LoanSTAR retrofit savings through December 1993 with an emphasis on the Constant Volume to Variable Air Volume air-handler retrofits. The report also summarizes several key findings about the ...
Improving Building Energy System Performance by Continuous Commissioning
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1996)
The term Continuous Commissioning (CC) was first used by engineers at the Energy Systems Lab (ESL) at Texas A&M University to describe an ongoing process which improves the operation of buildings using measured hourly ...