Search
Now showing items 1-3 of 3
LoanSTAR Monitoring and Analysis Program: Presentation Summary of the State Capitol Complex Building Operation and Maintenance Field Test
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)
During the Fall of 1992 a comprehensive survey was conducted on
eight buildings at the State Capitol Complex to determine potential
operations and maintenance (O&M) savings opportunities. A verbal
report of the findings ...
Insertion Paddlewheel Flowmeters: An Evaluation After Two Years of Use
(Energy Systems Laboratory (http://esl.eslwin.tamu.edu), 1993-03)
Insertion paddlewheel flowmeters were removed from field installations after 12 to 24 months of service for inspection and calibration. The tests were designed to identify meter degradation because of scale and debris on ...
Texas LoanSTAR Monitoring and Analysis Program: Report to the Monitoring and Analysis Review Committee
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M UniversityDepartment of Mechanical Engineering, Texas A&M University, 1993)