Continuous Commissioning® of a Modern Central Utility Plant
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2006)
Control Humidity With Single-Duct, Single-Zone, Constant Air Volume System
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
The lecture hall of the Richardson Petroleum
Building at Texas A&M University is a large lecture
hall, with a total floor area of approximately 2500 ft^2.
The lecture hall was served by a constant air volume
(CAV) air ...
Continuous Commissioning Results Verification and Follow-up For an Institutional Building: A Case Study
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
The Kleberg Building on the Texas A&M
University campus is a teaching/research facility
consisting of classrooms, offices and laboratories,
with a total floor area of approximately 165,030 ft2.
Continuous Commissioning ...
The Cost-Effectiveness of Continuous Commissioning® Over the Past Ten Years
(Energy Systems Laboratory (http://esl.tamu.edu), 2008-10)
Continuous Commissioning® data including savings, costs, and implemented measures from over 60 buildings and sites commissioned by staff from the Energy Systems Laboratory at Texas A&M University are presented. Measured ...
Improving Building Comfort and Energy Savings of the McKenzie Airport Terminal by Maintaining and Improving Pneumatic Control Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
McKenzie Airport Terminal is located at
Easterwood Airport, which is owned and
operated by Texas A&M University. It was built
in 1988. Most all HVAC equipment, which
includes boiler, chiller, pumps, AHUs and
exhaust fans, ...
Lessons Learned From the Continuous Commissioning of a Multi-Functional Commercial Building
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2000)
A multi-functional institutional building often
has ventilation and comfort requirements that vary
widely from zone to zone. When we commissioned
the Reed McDonald building on the main campus of
Texas A&M University (TAMU), ...
Achieving Better Building Performance and Savings Using Optimal Control Strategies
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Continuous Commissioning (CCSM) process has
become a very important energy conservation topic
for new and existing commercial buildings. This
process can yield substantial operating savings,
improved indoor air quality, ...
The Temperature and Relative Humidity Control in Cushing Library
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2002)
Cushing Library located on TAMU campus is a
special building, which needs precise temperature
and relative humidity control, because it stores a
number of rare collections and memorial books.
There are five air-handling ...
Continuous Commissioning of Salt Lake Community College South City Campus
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2004)
The State of Utah's Department of Natural Resources funded two projects in Salt Lake City to
demonstrate the feasibility of the Continuous Commissioning® (CC®)1 process. The two sites selected were a modern state
building, ...
Eliminating Humidity and Condensation Problems in University Dormitories - Case Study
(Texas A&M University (http://www.tamu.edu)Energy Systems Laboratory (http://esl.tamu.edu), 2002)
Krueger Hall, McFadden Hall and Rudder Hall are
dormitories used for housing on-campus students of
Texas A&M University (TAMU). These halls have
suffered with humidity problems for many years.
The Continuous Commissioning ...