Search
Now showing items 1-3 of 3
Baseline Report for the Fort Hood Army Base: Sept. 1, 2002 - Aug. 31, 2003
(Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
Room Temperature Control During Season Switchover with Single Duct Variable Air Volume System Without Reheat
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
The Langford “A” building houses the College of
Architecture on TAMU campus. There are ten singleduct
variable air volume (VAV) air-handling units
(AHUs) without reheat serving the building. The
local pneumatic thermostats ...
Improving Control of a Dual-Duct Single-Fan Variable Air Volume Systems
(Energy Systems Laboratory (http://esl.tamu.edu)Texas A&M University (http://www.tamu.edu), 2003)
This paper discusses improved control strategies
for dual-duct single-fan variable air volume (VAV)
systems. Common control strategy for supply air
volume modulation is evaluated, and an improved air
volume control strategy ...