Now showing items 611-630 of 8496

    • Coleman, Daniel E.; Plesz, Timothy A. (Texas A&M University. Turbomachinery Laboratories, 1993)
      Manufacturers in the compressor industry have experienced an increasing interest by their customers to be able to compare the as manufactured condition of critical components to their subsequent condition over time in ...
    • Haberl, J. S.; Baltazar, J. C.; Sung, Y. H.; Claridge, D. E.; Turner, W. D. (2002-12)
      This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, and the III Corp building at Ft. Hood. A baseline analysis is also presented for the natural ...
    • Haberl, J. S.; Baltazar-Cervantes, J. C.; Liu, Z.; Claridge, D. E.; Turner, W. D. (Energy Systems Laboratory (http://esl.tamu.edu), Texas A&M University, 2003)
      This report presents electricity, natural gas and cooling baselines for the thermal plant, buildings located in the 87000 block, III Corp building and other buildings that were determined to be part of the ESPC project at ...
    • Haberl, J. S.; Liu, Z. (2007-09-21)
      This report presents electricity, natural gas and cooling baselines for the Thermal Plant, III Corp building, Darnall Hospital, Main Substation, West Substation, and North Substation. The baselines developed for this ...
    • Geiger, T. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
    • Geiger, T. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2015)
    • Gathright, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2015)
    • Theising, T. R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Marscher, William D. (Texas A&M University. Turbomachinery Laboratories, 2005)
    • Phillippi, Greg (Turbomachinery Laboratories, Texas A&M Engineering Experiment Station, 2016)
      This tutorial provides a straightforward explanation of how a reciprocating compressor works relying heavily upon the pressure- volume diagram (P-V diagram) as a point of reference. The discussion begins with a thorough ...
    • Pillis, Joseph W. (Texas A&M University. Turbomachinery Laboratories, 1999)
      Rotary screw compressors are widely used today in chemical and petrochemical refining, gas processing, and in the oil patch. Common applications include refrigeration using hydrocarbons, hydrofluorocarbons (HFCs), and ...
    • Iyun, T. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
    • Yun, Geun-Woong (2009-05-15)
      LNG (Liquefied Natural Gas) is one of the fastest growing energy sources in the U.S. to fulfill the increasing energy demands. In order to meet the LNG demand, many LNG facilities including LNG importation terminals are ...
    • Bray, M. E.; Mellor, R.; Bollinger, J. M. (Energy Systems Laboratory (http://esl.tamu.edu), 1985-05)
      The Bayou Cogeneration Plant is a prime example of the high fuel efficiency and consequent energy savings an industrial company can realize from cogeneration. A joint venture of Big Three Industries, Inc., and ...
    • Lorenz, M. G. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2007)
      The Baytown Cogeneration Project installed a GE 7FA gas turbine generator that produces 160 MW of electricity and 560-klB/hr of superheated 1500-psig steam. All of the steam and electricity are consumed by the ExxonMobil ...
    • Porter, J. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2006)
    • Reimann, C. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2005)
    • Hokanson, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2014)
    • Cooper, Landon (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2018)
      Customer has four 4x8x13 BB1 booster pumps for produced water injection. One pump was recently repaired and ran for only 4 months. Typically these pumps run about 16-18 months. Before shutting down the pump it had a high ...
    • Singer, Michael; Walker, Joel (Texas A&M University. Turbomachinery Laboratories, 2009)