Show simple item record

Visit the Energy Systems Laboratory Homepage.

dc.creatorFiorino, D.
dc.date.accessioned2013-06-06T20:24:06Z
dc.date.available2013-06-06T20:24:06Z
dc.date.issued1989-09
dc.identifier.otherESL-IE-89-09-67
dc.identifier.urihttps://hdl.handle.net/1969.1/148980
dc.description.abstractThis paper will describe the existing conditions, strategic planning, feasibility study, economic analysis, design, specification, construction, and project management for the 2.9 megawatt “full shift” chilled water thermal energy storage retrofit project currently underway at Texas Instruments’ 1,142,000 square foot Electro-Optics manufacturing facility in Dallas, Texas. A subsequent paper will describe commissioning, operation, maintenance, and savings resulting from the project.en
dc.language.isoen_US
dc.publisherEnergy Systems Laboratory
dc.titleState-of-the-Art Thermal Energy Storage Retrofit at a Large Manufacturing Facilityen
dc.typePresentationen
dc.rights.requestablefalseen


This item appears in the following Collection(s)

Show simple item record