Visit the Energy Systems Laboratory Homepage.
dc.creator | Wei, G. | |
dc.creator | Zhou, J. | |
dc.creator | Turner, D. | |
dc.creator | Lilley, D. | |
dc.date.accessioned | 2011-05-02T15:36:45Z | |
dc.date.available | 2011-05-02T15:36:45Z | |
dc.date.issued | 2009-11 | |
dc.identifier.other | ESL-IC-09-11-27 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/94759 | |
dc.description | Abstract Only | en |
dc.description.abstract | Continuous Commissioning® (CC®) is a process that resolves operating problems, optimizes the HVAC system operation and controls to reduce building energy consumption and improve comfort based on current building conditions and requirements. The process typically achieves 15% whole building energy cost reduction with simple paybacks of less than two years. It has been used in over 450 federal, institutional, university, and commercial buildings and central plants with measured savings of over $100 million and 12.5 trillion Btus in primary energy since 1993. | en |
dc.language.iso | en_US | |
dc.publisher | Energy Systems Laboratory (http://esl.tamu.edu) | |
dc.subject | Continuous Commissioning | en |
dc.subject | LoanSTAR | en |
dc.subject | Energy Service Company | en |
dc.subject | Retrofit Projects | en |
dc.title | Integration of Continuous Commissioning as a Measure in LoanSTAR and Energy Services Contracts | en |
dc.type | Article | en |
This item appears in the following Collection(s)
-
ICEBO - International Conference for Enhanced Building Operations
International Conference for Enhanced Building Operations