dc.description.abstract | The on-line avilability of the five Frame-7E gas turbine generators installed at the 465MW Lyondell Cogeneration Plant was 90% and 95.2% respectively for the first two years of operation (1986-87). The 140MW steam turbine generator availability was well over 98% each year. Such favorable results are due primarily to the (1) formal training programs utilized before and continued after plant startup, (2) redundancies designed into the critical components of the plant, (3) the immediate actions taken on failures or near-failures, (4) a sound preventive maintenance program, and (5) improvements performed promptly on discovered design, operating, and maintenance weaknesses uncovered during the early months of operation. | en |
dc.language.iso | en_US | |
dc.publisher | Energy Systems Laboratory (http://esl.eslwin.tamu.edu) | |
dc.subject | Cogeneration Power Plant | en |
dc.subject | Gas Turbine Generators | en |
dc.title | Operating and Maintaining a 465MW Cogeneration Plant | en |