NOTE: Restrictions are in place to limit access to one or more of the files associated with this item. Authorized users must log in to gain access. Non-authorized users do not have access to these files.
Visit the Energy Systems Laboratory Homepage.
dc.creator | McReynolds, C.J. | |
dc.date.accessioned | 2010-08-26T17:07:35Z | |
dc.date.available | 2010-08-26T17:07:35Z | |
dc.date.issued | 1989-09 | |
dc.identifier.other | ESL-IE-89-09-16 | |
dc.identifier.uri | https://hdl.handle.net/1969.1/92307 | |
dc.description.abstract | The 33 year-old Ford plant at Sandusky, Ohio, had been expanded many times over the years and presently manufactures a variety of metal and plastic automotive parts such as plastic heater housings. As more plastic extruders were added, the plant developed severe haze and fume problems caused by frequent purging of the extruders in the plastic molding area. Much of the heating and ventilating equipment was as old as the plant and in disrepair. These problems resulted in severe union grievances that threatened to close the plant. | en |
dc.language.iso | en_US | |
dc.publisher | Energy Systems Laboratory (http://esl.eslwin.tamu.edu) | |
dc.subject | Heating and Ventilating System | en |
dc.title | A Unique Ductless H and V System for Manufacturing Plants | en |
dc.type | Presentation | en |
This item appears in the following Collection(s)
-
IETC - Industrial Energy Technology Conference
Industrial Energy Technology Conference